VCA5807EVM

Mfr. #: VCA5807EVM
Fabricante: Texas Instruments
Descripción: MODULE EVAL FOR VCA5807
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: VCA5807EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA5807EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Instrumentation Amplifiers Bulk is the packaging method for this product This product is designed VCA5807 amplifier. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 3.15 V ~ 3.6 V, 4.75 V ~ 5.5 V The 800kHz The -. Current-Output-Channel is 20mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA5807 Board type: Fully Populated. The product has 8 - Octal channel per IC. This tool is designed for the VCA5807. USB interface type

VCA5807EVM Image

VCA5807EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA5807EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Instrumentation Amplifiers
  • Packaging Bulk
  • For-Use-With VCA5807
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 3.15 V ~ 3.6 V, 4.75 V ~ 5.5 V
  • -3db-Bandwidth 800kHz
  • Slew-Rate -
  • Current-Output-Channel 20mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA5807
  • Board-Type Fully Populated
  • Channels-per-IC 8 - Octal
  • Current-Supply-Main-IC -
  • Tool-Is-For-Evaluation-Of VCA5807
  • Interface-Type USB

VCA5807EVM

VCA5807EVM Specifications

VCA5807EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Instrumentation Amplifiers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is VCA5807.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 85°C.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Differential.

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 3.15 V ~ 3.6 V, 4.75 V ~ 5.5 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 800kHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is -.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 20mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Variable Gain.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is VCA5807.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 8 - Octal.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed VCA5807

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
298,50 US$
298,50 US$
10
283,58 US$
2 835,75 US$
100
268,65 US$
26 865,00 US$
500
253,72 US$
126 862,50 US$
1000
238,80 US$
238 800,00 US$
Top