VCA2617EVM

Mfr. #: VCA2617EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE FOR VCA2617
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: VCA2617EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2617EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 50MHz The 100 V/μs. Current-Output-Channel is 60mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2617 Board type: Fully Populated. The product has 2 - Dual channel per IC.

VCA2617EVM Image

VCA2617EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2617EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 50MHz
  • Slew-Rate 100 V/μs
  • Current-Output-Channel 60mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2617
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -

VCA2617EVM

VCA2617EVM Specifications

VCA2617EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 4.75 V ~ 5.25 V.

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is 50MHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 100 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 60mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Variable Gain.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed VCA2617

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 2 - Dual.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
223,50 US$
223,50 US$
10
212,32 US$
2 123,25 US$
100
201,15 US$
20 115,00 US$
500
189,98 US$
94 987,50 US$
1000
178,80 US$
178 800,00 US$
Top