| Mfr. #: | UCC28911EVM-718 |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | UCC28911 AC to DC Switching Converters 4.75VDC to 5.25VDC Output Evaluation Board |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | UCC28911EVM-718 Ficha de datos |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: AC/DC Converters The AC/DC, Primary Side is the Main-Purpose. 85 ~ 265 VAC voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 5V Flyback regulator topology 7.5W Included item: Board. IC package type: UCC28911 Board type: Fully Populated. The product has 1, Isolated outputs. Output voltage: 5 V This tool is designed for the UCC28911. Our product measures 5 in x 3.5 in x 1 in in dimensions for compact and convenient use. Input Voltage Range: 115 V/230 V Output current: 1.5 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28911EVM-718 Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is AC/DC Converters.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed AC/DC, Primary Side
A: What is the Voltage-Input of the product?
Q: The Voltage-Input of the product is 85 ~ 265 VAC.
A: What is the Frequency-Switching of the product?
Q: The Frequency-Switching of the product is -.
A: What is the Voltage-Output of the product?
Q: The Voltage-Output of the product is 5V.
A: At what frequency does the Regulator-Topology?
Q: The product Regulator-Topology is Flyback.
A: At what frequency does the Power-Output?
Q: The product Power-Output is 7.5W.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is UCC28911.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: What is the Outputs-and-Type of the product?
Q: The Outputs-and-Type of the product is 1, Isolated.
A: At what frequency does the Output-Voltage?
Q: The product Output-Voltage is 5 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is UCC28911.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 5 in x 3.5 in x 1 in.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 115 V/230 V.
A: What is the Output-Current of the product?
Q: The Output-Current of the product is 1.5 A.