Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2004 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2004.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2004EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Resistive Touch Sensors
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Interface, Touch Screen Controller.
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TSC2004
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 3.3 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TSC2004.