TRF371135EVM

Mfr. #: TRF371135EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR TRF371135
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TRF371135EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF371135EVM Overview

Compatible with TRF371135. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Demodulator This product's 1.7GHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board, Cable. This product operates at a 5 V supply voltage for reliable performance. This product is an Used to test the performance of the TRF371135 direct quadrature demodulator device. This tool is designed for the TRF371135. USB interface type

TRF371135EVM Image

TRF371135EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF371135EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF371135
  • Series -
  • Product Evaluation Modules
  • Type Demodulator
  • Frequency 1.7GHz ~ 6GHz
  • Supplied-Contents Board, Cable
  • Operating-Supply-Voltage 5 V
  • Description-Function Used to test the performance of the TRF371135 direct quadrature demodulator device
  • Tool-Is-For-Evaluation-Of TRF371135
  • Interface-Type USB

TRF371135EVM

TRF371135EVM Specifications

TRF371135EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF371135

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Demodulator.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 1.7GHz ~ 6GHz.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Cable

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Used to test the performance of the TRF371135 direct quadrature demodulator device.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF371135.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
448,50 US$
448,50 US$
10
426,08 US$
4 260,75 US$
100
403,65 US$
40 365,00 US$
500
381,22 US$
190 612,50 US$
1000
358,80 US$
358 800,00 US$
Top