TRF2436EVM

Mfr. #: TRF2436EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR TRF2436
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TRF2436EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF2436EVM Overview

Compatible with TRF2436. Product belongs to the - series. Type: Front End This product's 2.4GHz ~ 2.5GHz, 4.9GHz ~ 5.9GHz range is 0Hz to 2.2GHz. Included item: Board.

TRF2436EVM Image

TRF2436EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF2436EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF2436
  • Series -
  • Type Front End
  • Frequency 2.4GHz ~ 2.5GHz, 4.9GHz ~ 5.9GHz
  • Supplied-Contents Board

TRF2436EVM

TRF2436EVM Specifications

TRF2436EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF2436.

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Type of the product?

    Q: The Type of the product is Front End.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 2.4GHz ~ 2.5GHz, 4.9GHz ~ 5.9GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
463,52 US$
463,52 US$
10
440,34 US$
4 403,39 US$
100
417,16 US$
41 716,35 US$
500
393,99 US$
196 993,90 US$
1000
370,81 US$
370 812,00 US$
Top