TPS62748EVM-706

Mfr. #: TPS62748EVM-706
Fabricante: Texas Instruments
Descripción: TPS62748 Ultra Low Iq Step-Down Converter Evaluation Module with Load Switch
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS62748EVM-706 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62748EVM-706 Overview

This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators Output voltage: 1.2 V/1.8 V This product is an TPS62748 300 mA synchronous step down converter. This tool is designed for the TPS62748. Input Voltage Range: 2 V to 5.5 V Output current: 300 mA

TPS62748EVM-706 Image

TPS62748EVM-706

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62748EVM-706 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • Output-Voltage 1.2 V/1.8 V
  • Description-Function TPS62748 300 mA synchronous step down converter
  • Tool-Is-For-Evaluation-Of TPS62748
  • Input-Voltage 2 V to 5.5 V
  • Output-Current 300 mA

TPS62748EVM-706

TPS62748EVM-706 Specifications

TPS62748EVM-706 FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 1.2 V/1.8 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed TPS62748 300 mA synchronous step down converter

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS62748.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2 V to 5.5 V

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 300 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
73,50 US$
73,50 US$
10
69,82 US$
698,25 US$
100
66,15 US$
6 615,00 US$
500
62,48 US$
31 237,50 US$
1000
58,80 US$
58 800,00 US$
Top