| Mfr. #: | TPS40192EVM-525 |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MODULE FOR TPS40192-525 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TPS40192EVM-525 Ficha de datos |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Switching Controllers Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 8 V ~ 14 V voltage input This product features 'Frequency-Switching' at 600kHz for optimal performance. Output voltage: 1.8V Buck regulator topology - Included item: Board. IC package type: TPS40192 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 1.8 V This product is an TPS40192 - DC/DC, Step Down 1,Non-Isolated Outputs Evaluation Board. This tool is designed for the TPS40192. Our product measures 1.2 in x 1 in in dimensions for compact and convenient use. Input Voltage Range: 12 V Output current: 10 A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40192EVM-525 Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Switching Controllers.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is DC/DC, Step Down.
A: Is the cutoff frequency of the product Voltage-Input?
Q: Yes, the product's Voltage-Input is indeed 8 V ~ 14 V
A: Is the cutoff frequency of the product Frequency-Switching?
Q: Yes, the product's Frequency-Switching is indeed 600kHz
A: Is the cutoff frequency of the product Voltage-Output?
Q: Yes, the product's Voltage-Output is indeed 1.8V
A: What is the Regulator-Topology of the product?
Q: The Regulator-Topology of the product is Buck.
A: Is the cutoff frequency of the product Power-Output?
Q: Yes, the product's Power-Output is indeed -
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TPS40192.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: Is the cutoff frequency of the product Outputs-and-Type?
Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated
A: At what frequency does the Output-Voltage?
Q: The product Output-Voltage is 1.8 V.
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed TPS40192 - DC/DC, Step Down 1,Non-Isolated Outputs Evaluation Board
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS40192
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 1.2 in x 1 in.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 12 V.
A: What is the Output-Current of the product?
Q: The Output-Current of the product is 10 A.