TPS40180EVM

Mfr. #: TPS40180EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR TPS40180
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS40180EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40180EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Switching Controllers Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 10.8 V ~ 13.2 V voltage input This product features 'Frequency-Switching' at 285kHz for optimal performance. Output voltage: 1.5V Buck regulator topology - Included item: Board. IC package type: TPS40180 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 1.5 V This tool is designed for the TPS40180. Input Voltage Range: 12 V

TPS40180EVM Image

TPS40180EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40180EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Switching Controllers
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 10.8 V ~ 13.2 V
  • Frequency-Switching 285kHz
  • Current-Output 20A
  • Voltage-Output 1.5V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS40180
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 1.5 V
  • Tool-Is-For-Evaluation-Of TPS40180
  • Input-Voltage 12 V

TPS40180EVM

TPS40180EVM Specifications

TPS40180EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Down.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 10.8 V ~ 13.2 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is 285kHz.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 1.5V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS40180

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 1.5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS40180.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 12 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
76,10 US$
76,10 US$
10
72,29 US$
722,90 US$
100
68,49 US$
6 848,55 US$
500
64,68 US$
32 340,40 US$
1000
60,88 US$
60 876,00 US$
Top