TPS2412EVM

Mfr. #: TPS2412EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR TPS2412
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS2412EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2412EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers Bulk is the packaging method for this product The Power Management, ORing Controller / Load Share is the Main-Purpose. Primary-Attributes: N+1 Power Supplies IC package type: TPS2412 This tool is designed for the TPS2412. Our product measures 94 mm x 76.2 mm in dimensions for compact and convenient use. Input Voltage Range: 1 V to 5 V

TPS2412EVM Image

TPS2412EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2412EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Packaging Bulk
  • Main-Purpose Power Management, ORing Controller / Load Share
  • Primary-Attributes N+1 Power Supplies
  • Embedded No
  • Utilized-IC-Part TPS2412
  • Tool-Is-For-Evaluation-Of TPS2412
  • Dimensions 94 mm x 76.2 mm
  • Input-Voltage 1 V to 5 V

TPS2412EVM

TPS2412EVM Specifications

TPS2412EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, ORing Controller / Load Share.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is N+1 Power Supplies.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS2412.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS2412

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 94 mm x 76.2 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 1 V to 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
56,74 US$
56,74 US$
10
53,91 US$
539,08 US$
100
51,07 US$
5 107,05 US$
500
48,23 US$
24 116,65 US$
1000
45,40 US$
45 396,00 US$
Top