TPS2115EVM

Mfr. #: TPS2115EVM
Fabricante: Texas Instruments
Descripción: EVAL MOD FOR TPS2115
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS2115EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2115EVM Overview

Product belongs to the - series. The Power Management, Power Distribution Switch (Load Switch) is the Main-Purpose. Primary-Attributes: - IC package type: TPS2115

TPS2115EVM Image

TPS2115EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2115EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Power Management, Power Distribution Switch (Load Switch)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2115

TPS2115EVM

TPS2115EVM Specifications

TPS2115EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Power Distribution Switch (Load Switch).

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS2115.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
56,74 US$
56,74 US$
10
53,91 US$
539,08 US$
100
51,07 US$
5 107,05 US$
500
48,23 US$
24 116,65 US$
1000
45,40 US$
45 396,00 US$
Top