TPD5S116EVM

Mfr. #: TPD5S116EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR TPD5S116
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPD5S116EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPD5S116EVM Overview

Product belongs to the TPD5A116 series. This product is categorized as Evaluation Modules Type: HDMI Display Interface This product is designed TPD5S116 amplifier. The Circuit Protection, Electrostatic Discharge (ESD) is the Main-Purpose. Primary-Attributes: - IC package type: TPD4S010, TPD5S116, TPD8S009 This product operates at a 3.3 V supply voltage for reliable performance. This product is an Provides full functionality of TPD5S116. This tool is designed for the TPD5S116. HDMI I2C interface type

TPD5S116EVM Image

TPD5S116EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPD5S116EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TPD5A116
  • Product Evaluation Modules
  • Type HDMI Display Interface
  • For-Use-With TPD5S116
  • Main-Purpose Circuit Protection, Electrostatic Discharge (ESD)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPD4S010, TPD5S116, TPD8S009
  • Operating-Supply-Voltage 3.3 V
  • Description-Function Provides full functionality of TPD5S116
  • Tool-Is-For-Evaluation-Of TPD5S116
  • Interface-Type HDMI I2C

TPD5S116EVM

TPD5S116EVM Specifications

TPD5S116EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TPD5A116.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is HDMI Display Interface.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is TPD5S116.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Circuit Protection, Electrostatic Discharge (ESD)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPD4S010, TPD5S116, TPD8S009.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Provides full functionality of TPD5S116

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPD5S116

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is HDMI I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
76,04 US$
76,04 US$
10
72,23 US$
722,33 US$
100
68,43 US$
6 843,15 US$
500
64,63 US$
32 314,90 US$
1000
60,83 US$
60 828,00 US$
Top