TPA3123D2EVM

Mfr. #: TPA3123D2EVM
Fabricante: Texas Instruments
Descripción: TPA3123D2EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPA3123D2EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3123D2EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 10 V ~ 30 V Maximum Output Power of 25W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA3123D2 Board type: Fully Populated. This product operates at a 10 V to 30 V supply voltage for reliable performance. This tool is designed for the TPA3123D2. 2 A is 92 nA.

TPA3123D2EVM Image

TPA3123D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3123D2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 10 V ~ 30 V
  • Max-Output-Power-x-Channels-Load 25W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Output-Power 24 W
  • Utilized-IC-Part TPA3123D2
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 10 V to 30 V
  • Tool-Is-For-Evaluation-Of TPA3123D2
  • Operating-Supply-Current 2 A

TPA3123D2EVM

TPA3123D2EVM Specifications

TPA3123D2EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 10 V ~ 30 V.

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 25W x 2 @ 4 Ohm

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPA3123D2.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 10 V to 30 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPA3123D2.

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 2 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
148,50 US$
148,50 US$
10
141,08 US$
1 410,75 US$
100
133,65 US$
13 365,00 US$
500
126,22 US$
63 112,50 US$
1000
118,80 US$
118 800,00 US$
Top