| Mfr. #: | TPA2001D2EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MOD FOR TPA2001D2 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TPA2001D2EVM Ficha de datos |


Product belongs to the - series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 4.5 V ~ 5.5 V Maximum Output Power of 1W x 2 @ 8 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2001D2 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA2001D2.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2001D2EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Type?
Q: The product Type is Audio Amplifiers.
A: What is the Output-Type of the product?
Q: The Output-Type of the product is 2-Channel (Stereo).
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 4.5 V ~ 5.5 V.
A: What is the Max-Output-Power-x-Channels-Load of the product?
Q: The Max-Output-Power-x-Channels-Load of the product is 1W x 2 @ 8 Ohm.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Class D.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TPA2001D2.
A: At what frequency does the Board-Type?
Q: The product Board-Type is Fully Populated.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 5 V to 15 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TPA2001D2.