TMP709EVM

Mfr. #: TMP709EVM
Fabricante: Texas Instruments
Descripción: Sensor Development Tools Temperature Sensor Development Tools TMP709 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TMP709EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP709EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP709 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP709.

TMP709EVM Image

TMP709EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP709EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Sensitivity ±3°C
  • Interface Analog
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Thermostat
  • Sensing-Range 0°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP709
  • Maximum-Operating-Temperature + 125 C
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of TMP709

TMP709EVM

TMP709EVM Specifications

TMP709EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensors

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±3°C

  • A: At what frequency does the Interface?

    Q: The product Interface is Analog.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Thermostat.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is 0°C ~ 125°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP709.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP709

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
63,42 US$
63,42 US$
10
60,25 US$
602,49 US$
100
57,08 US$
5 707,80 US$
500
53,91 US$
26 953,50 US$
1000
50,74 US$
50 736,00 US$
Top