TMP122EVM

Mfr. #: TMP122EVM
Fabricante: Texas Instruments
Descripción: Sensor Development Tools Temperature Sensor Development Tools TMP122 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TMP122EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP122EVM Overview

Product belongs to the - series. Sensitivity: ±0.5°C Interface: SPI Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 150°C Included item: Board. IC package type: TMP122

TMP122EVM Image

TMP122EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP122EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity ±0.5°C
  • Interface SPI
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP122

TMP122EVM

TMP122EVM Specifications

TMP122EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±0.5°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is SPI.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 2.7 V ~ 5.5 V

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -55°C ~ 150°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP122.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
96,70 US$
96,70 US$
10
91,87 US$
918,70 US$
100
87,03 US$
8 703,45 US$
500
82,20 US$
41 099,65 US$
1000
77,36 US$
77 364,00 US$
Top