TMP108EVM

Mfr. #: TMP108EVM
Fabricante: Texas Instruments
Descripción: Sensor Development Tools Temperature Sensor Development Tools TMP108 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TMP108EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP108EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Sensitivity: ±1°C Interface: I2C, SMBus, USB Voltage Supply Range: 1.4 V ~ 3.6 V Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP108 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP108. I2C USB interface type

TMP108EVM Image

TMP108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Sensitivity ±1°C
  • Interface I2C, SMBus, USB
  • Voltage-Supply 1.4 V ~ 3.6 V
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP108
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP108
  • Interface-Type I2C USB

TMP108EVM

TMP108EVM Specifications

TMP108EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±1°C

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, SMBus, USB.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 1.4 V ~ 3.6 V.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP108.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 125 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP108.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
112,50 US$
112,50 US$
10
106,88 US$
1 068,75 US$
100
101,25 US$
10 125,00 US$
500
95,62 US$
47 812,50 US$
1000
90,00 US$
90 000,00 US$
Top