TMP103EVM

Mfr. #: TMP103EVM
Fabricante: Texas Instruments
Descripción: Sensor Development Tools Temperature Sensor Development Tools TMP103 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TMP103EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP103EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1°C Interface: I2C, USB Voltage Supply Range: 5V, USB Temperature Sensing range of -40°C ~ 125°C Included item: Board, Cables. IC package type: TMP103 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.4 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TMP103. I2C SMBus interface type

TMP103EVM Image

TMP103EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP103EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1°C
  • Interface I2C, USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents Board, Cables
  • Embedded No
  • Utilized-IC-Part TMP103
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.4 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TMP103
  • Interface-Type I2C SMBus

TMP103EVM

TMP103EVM Specifications

TMP103EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±1°C

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, USB.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 5V, USB.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -40°C ~ 125°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Cables

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP103.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 125 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.4 V to 3.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP103.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C SMBus.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
73,50 US$
73,50 US$
10
69,82 US$
698,25 US$
100
66,15 US$
6 615,00 US$
500
62,48 US$
31 237,50 US$
1000
58,80 US$
58 800,00 US$
Top