TMP102EVM

Mfr. #: TMP102EVM
Fabricante: Texas Instruments
Descripción: Sensor Development Tools Temperature Sensor Development Tools TMP102 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TMP102EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP102EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±3°C Interface: Serial Voltage Supply Range: 3.3V Temperature Sensing range of -40°C ~ 125°C Included item: Board, Cables. IC package type: TMP102 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.4 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TMP102. I2C USB interface type

TMP102EVM Image

TMP102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP102EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±3°C
  • Interface Serial
  • Voltage-Supply 3.3V
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents Board, Cables
  • Embedded No
  • Utilized-IC-Part TMP102
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.4 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TMP102
  • Interface-Type I2C USB

TMP102EVM

TMP102EVM Specifications

TMP102EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±3°C

  • A: At what frequency does the Interface?

    Q: The product Interface is Serial.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 3.3V

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cables.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP102

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.4 V to 3.6 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP102.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
73,50 US$
73,50 US$
10
69,82 US$
698,25 US$
100
66,15 US$
6 615,00 US$
500
62,48 US$
31 237,50 US$
1000
58,80 US$
58 800,00 US$
Top