THS7360EVM

Mfr. #: THS7360EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR THS7360
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: THS7360EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS7360EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product The Video, Amplifier, 6 Channel is the Main-Purpose. Primary-Attributes: - IC package type: THS7360 This product operates at a 5.5 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the THS7360. 0.1 uA is 92 nA.

THS7360EVM Image

THS7360EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS7360EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Packaging Bulk
  • Main-Purpose Video, Amplifier, 6 Channel
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part THS7360
  • Operating-Supply-Voltage 5.5 V
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of THS7360
  • Operating-Supply-Current 0.1 uA

THS7360EVM

THS7360EVM Specifications

THS7360EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Video, Amplifier, 6 Channel

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS7360

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5.5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation Module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is THS7360.

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 0.1 uA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
28,64 US$
28,64 US$
10
27,20 US$
272,03 US$
100
25,77 US$
2 577,15 US$
500
24,34 US$
12 169,90 US$
1000
22,91 US$
22 908,00 US$
Top