| Mfr. #: | THS5651EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MOD FOR THS5651 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | THS5651EVM Ficha de datos |


This product is categorized as Evaluation Modules Type: DAC This product operates at a 3.3 V 5 V supply voltage for reliable performance. This tool is designed for the THS5651A. Our product measures 107.95 mm x 85.73 mm in dimensions for compact and convenient use.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS5651EVM Specifications
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is DAC.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V 5 V
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is THS5651A.
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 107.95 mm x 85.73 mm