TAS2521EVM

Mfr. #: TAS2521EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE TAS2521
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TAS2521EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS2521EVM Overview

Product belongs to the TAS2521 series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed TAS2521 amplifier. Output-Type: 1-Channel (Mono) with Mono Headphones Voltage Supply Range: 1.5 V ~ 1.95 V Maximum Output Power of 2W x 1 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS2521 Board type: Fully Populated. Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 1.8 V supply voltage for reliable performance. This product is an TAS2521 Evaluation Module. I2S DSP TDM interface type

TAS2521EVM Image

TAS2521EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS2521EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series TAS2521
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With TAS2521
  • Output-Type 1-Channel (Mono) with Mono Headphones
  • Voltage-Supply 1.5 V ~ 1.95 V
  • Max-Output-Power-x-Channels-Load 2W x 1 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Utilized-IC-Part TAS2521
  • Board-Type Fully Populated
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.8 V
  • Description-Function TAS2521 Evaluation Module
  • Interface-Type I2S DSP TDM

TAS2521EVM

TAS2521EVM Specifications

TAS2521EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TAS2521

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TAS2521.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 1-Channel (Mono) with Mono Headphones.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 1.5 V ~ 1.95 V.

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 2W x 1 @ 4 Ohm

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Class D

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TAS2521.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TAS2521 Evaluation Module.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2S DSP TDM

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
114,63 US$
114,63 US$
10
108,90 US$
1 088,98 US$
100
103,17 US$
10 316,70 US$
500
97,44 US$
48 717,75 US$
1000
91,70 US$
91 704,00 US$
Top