SN65LVCP114EVM

Mfr. #: SN65LVCP114EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR SN65LVCP114
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: SN65LVCP114EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SN65LVCP114EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Multiplexer / Demultiplexer Switches The Interface, Re-Driver is the Main-Purpose. Primary-Attributes: - IC package type: SN65LVCP114 This product operates at a 2.5 V 3.3 V supply voltage for reliable performance. This tool is designed for the SN65LVCP114. USB interface type

SN65LVCP114EVM Image

SN65LVCP114EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SN65LVCP114EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Multiplexer / Demultiplexer Switches
  • Main-Purpose Interface, Re-Driver
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part SN65LVCP114
  • Operating-Supply-Voltage 2.5 V 3.3 V
  • Tool-Is-For-Evaluation-Of SN65LVCP114
  • Interface-Type USB

SN65LVCP114EVM

SN65LVCP114EVM Specifications

SN65LVCP114EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Multiplexer / Demultiplexer Switches.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Re-Driver

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is SN65LVCP114.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.5 V 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is SN65LVCP114.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
925,17 US$
925,17 US$
10
878,91 US$
8 789,12 US$
100
832,65 US$
83 265,30 US$
500
786,39 US$
393 197,25 US$
1000
740,14 US$
740 136,00 US$
Top