PGA900EVM

Mfr. #: PGA900EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE PGA900
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: PGA900EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PGA900EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Board Type: Signal Conditioning Bulk is the packaging method for this product The Interface, Sensor Signal Conditioner is the Main-Purpose. Primary-Attributes: - IC package type: PGA900 Maximum operating temperature of + 150 C Minimum operating temperature: - 40 C This product operates at a 3.3 V to 30 V supply voltage for reliable performance. This product is an Evaluation Baord for Resistive Sensing Conditioner. This tool is designed for the PGA900. I2C interface type Our product measures 5 in x 2.3 in in dimensions for compact and convenient use.

PGA900EVM Image

PGA900EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PGA900EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Board
  • Type Signal Conditioning
  • Packaging Bulk
  • Main-Purpose Interface, Sensor Signal Conditioner
  • Primary-Attributes -
  • Embedded Yes, MCU, 32-Bit
  • Utilized-IC-Part PGA900
  • Maximum-Operating-Temperature + 150 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 3.3 V to 30 V
  • Description-Function Evaluation Baord for Resistive Sensing Conditioner
  • Tool-Is-For-Evaluation-Of PGA900
  • Interface-Type I2C
  • Dimensions 5 in x 2.3 in

PGA900EVM

PGA900EVM Specifications

PGA900EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Board.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Signal Conditioning

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Sensor Signal Conditioner.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is PGA900.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 150 C

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 30 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation Baord for Resistive Sensing Conditioner.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is PGA900.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 5 in x 2.3 in.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
386,68 US$
386,68 US$
10
367,35 US$
3 673,51 US$
100
348,02 US$
34 801,65 US$
500
328,68 US$
164 341,15 US$
1000
309,35 US$
309 348,00 US$
Top