PCM2903EVM-U

Mfr. #: PCM2903EVM-U
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR PCM2903-U
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: PCM2903EVM-U Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM2903EVM-U Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Audio DAC Bulk is the packaging method for this product The Audio, CODEC is the Main-Purpose. Primary-Attributes: - IC package type: PCM2903 This product operates at a 5 V supply voltage for reliable performance. This product is an PCM2903 evaluation module. This tool is designed for the PCM2903. USB interface type

PCM2903EVM-U Image

PCM2903EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM2903EVM-U Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Audio DAC
  • Packaging Bulk
  • Main-Purpose Audio, CODEC
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part PCM2903
  • Operating-Supply-Voltage 5 V
  • Description-Function PCM2903 evaluation module
  • Tool-Is-For-Evaluation-Of PCM2903
  • Interface-Type USB

PCM2903EVM-U

PCM2903EVM-U Specifications

PCM2903EVM-U FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Audio DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Audio, CODEC

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed PCM2903

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is PCM2903 evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is PCM2903.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
223,50 US$
223,50 US$
10
212,32 US$
2 123,25 US$
100
201,15 US$
20 115,00 US$
500
189,98 US$
94 987,50 US$
1000
178,80 US$
178 800,00 US$
Top