LP8728EVM

Mfr. #: LP8728EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR LP8728
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LP8728EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8728EVM Overview

Product belongs to the LP8728 series. The DC/DC, Step Down is the Main-Purpose. 4.5 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 3.3MHz for optimal performance. Output voltage: 1.25V, 1.8V, 2.65V, 3.3V Buck regulator topology - Included item: Board. IC package type: LP8728 Board type: Fully Populated. The product has 4, Non-Isolated outputs.

LP8728EVM Image

LP8728EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8728EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series LP8728
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4.5 V ~ 5.5 V
  • Frequency-Switching 3.3MHz
  • Current-Output -
  • Voltage-Output 1.25V, 1.8V, 2.65V, 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part LP8728
  • Board-Type Fully Populated
  • Outputs-and-Type 4, Non-Isolated

LP8728EVM

LP8728EVM Specifications

LP8728EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LP8728

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 4.5 V ~ 5.5 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 3.3MHz.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 1.25V, 1.8V, 2.65V, 3.3V

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is Buck.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LP8728.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 4, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
172,52 US$
172,52 US$
10
163,89 US$
1 638,89 US$
100
155,26 US$
15 526,35 US$
500
146,64 US$
73 318,90 US$
1000
138,01 US$
138 012,00 US$
Top