LM3630EVM

Mfr. #: LM3630EVM
Fabricante: Texas Instruments
Descripción: LED Lighting Development Tools LM3630 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LM3630EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM3630EVM Overview

Product belongs to the LM3630 series. This product is categorized as Evaluation Modules This product is designed LM3630 amplifier. 2.3 V ~ 5.5 V voltage input Current-Output-Channel is - Output voltage: - Included item: Board, Cable. IC package type: LM3630 The product has - outputs. Processor Core: LM3630

LM3630EVM Image

LM3630EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM3630EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series LM3630
  • Product Evaluation Modules
  • For-Use-With LM3630
  • Features Dimmable, USB Interface
  • Voltage-Input 2.3 V ~ 5.5 V
  • Current-Output-Channel -
  • Voltage-Output -
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part LM3630
  • Outputs-and-Type -
  • Core LM3630

LM3630EVM

LM3630EVM Specifications

LM3630EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is LM3630.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LM3630.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 2.3 V ~ 5.5 V

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed -

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Cable.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LM3630

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed -

  • A: What is the Core of the product?

    Q: The Core of the product is LM3630.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
0,00 US$
0,00 US$
10
0,00 US$
0,00 US$
100
0,00 US$
0,00 US$
500
0,00 US$
0,00 US$
1000
0,00 US$
0,00 US$
Top