| Mfr. #: | INA149EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MODULE FOR INA149 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | INA149EVM Ficha de datos |


Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C Output-Type: - Voltage supply range: 4 V ~ 36 V, ±2 V ~ 18 V The 500kHz The 5 V/μs. Current-Output-Channel is 25mA The amplifier is of Differential type. Included item: Board. IC package type: INA149 Board type: Fully Populated. The product has 1 - Single channel per IC. This product is an Evaluation Module. This tool is designed for the INA149.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA149EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Kits
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Operating-Temperature?
Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 125°C
A: At what frequency does the Output-Type?
Q: The product Output-Type is -.
A: What is the Voltage-Supply-Single-Dual of the product?
Q: The Voltage-Supply-Single-Dual of the product is 4 V ~ 36 V, ±2 V ~ 18 V.
A: Is the cutoff frequency of the product -3db-Bandwidth?
Q: Yes, the product's -3db-Bandwidth is indeed 500kHz
A: What is the Slew-Rate of the product?
Q: The Slew-Rate of the product is 5 V/μs.
A: At what frequency does the Current-Output-Channel?
Q: The product Current-Output-Channel is 25mA.
A: At what frequency does the Amplifier-Type?
Q: The product Amplifier-Type is Differential.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed INA149
A: Is the cutoff frequency of the product Board-Type?
Q: Yes, the product's Board-Type is indeed Fully Populated
A: Is the cutoff frequency of the product Channels-per-IC?
Q: Yes, the product's Channels-per-IC is indeed 1 - Single
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed Evaluation Module
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is INA149.