HDC1000EVM

Mfr. #: HDC1000EVM
Fabricante: Texas Instruments
Descripción: Sensor Development Tools Temperature Sensor Development Tools HDC1000 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: HDC1000EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
HDC1000EVM Overview

Product belongs to the HDC1000 series. This product is categorized as Evaluation Kits Type: Humidity Temperature Sensors Sensitivity: ±0.2°C, ±3% Interface: I2C Voltage Supply Range: - Humidity, Temperature Sensing range of -20°C ~ 85°C, 0 ~ 100% RH Included item: Board. IC package type: HDC1000 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the HDC1000. I2C USB interface type

HDC1000EVM Image

HDC1000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HDC1000EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series HDC1000
  • Product Evaluation Kits
  • Type Humidity Temperature Sensors
  • Sensitivity ±0.2°C, ±3%
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Humidity, Temperature
  • Sensing-Range -20°C ~ 85°C, 0 ~ 100% RH
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part HDC1000
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of HDC1000
  • Interface-Type I2C USB

HDC1000EVM

HDC1000EVM Specifications

HDC1000EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is HDC1000.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is Humidity Temperature Sensors.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±0.2°C, ±3%

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Humidity, Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -20°C ~ 85°C, 0 ~ 100% RH

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed HDC1000

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed HDC1000

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
32,58 US$
32,58 US$
10
30,95 US$
309,51 US$
100
29,32 US$
2 932,20 US$
500
27,69 US$
13 846,50 US$
1000
26,06 US$
26 064,00 US$
Top