EVM430-FR6989

Mfr. #: EVM430-FR6989
Fabricante: Texas Instruments
Descripción: EVAL MOD FLOW METER MSP430FR6989
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: EVM430-FR6989 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
EVM430-FR6989 Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product The Reference Design, Flow Meter is the Main-Purpose. Primary-Attributes: - IC package type: MSP430FR698x This product operates at a 3.3 V supply voltage for reliable performance. This product is an Water meter reference design - extended scan interface (ESI) enabled ultra-low power MSP430FR6989. This tool is designed for the MSP430FR6989. I2C SPI UART USB interface type Processor Core: MSP430 The 16 bit.

EVM430-FR6989 Image

EVM430-FR6989

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-FR6989 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • Main-Purpose Reference Design, Flow Meter
  • Primary-Attributes -
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part MSP430FR698x
  • Operating-Supply-Voltage 3.3 V
  • Description-Function Water meter reference design - extended scan interface (ESI) enabled ultra-low power MSP430FR6989
  • Tool-Is-For-Evaluation-Of MSP430FR6989
  • Interface-Type I2C SPI UART USB
  • Core MSP430
  • Data-Bus-Width 16 bit

EVM430-FR6989

EVM430-FR6989 Specifications

EVM430-FR6989 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Reference Design, Flow Meter

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed MSP430FR698x

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Water meter reference design - extended scan interface (ESI) enabled ultra-low power MSP430FR6989.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed MSP430FR6989

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C SPI UART USB.

  • A: Is the cutoff frequency of the product Core?

    Q: Yes, the product's Core is indeed MSP430

  • A: Is the cutoff frequency of the product Data-Bus-Width?

    Q: Yes, the product's Data-Bus-Width is indeed 16 bit

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
448,50 US$
448,50 US$
10
426,08 US$
4 260,75 US$
100
403,65 US$
40 365,00 US$
500
381,22 US$
190 612,50 US$
1000
358,80 US$
358 800,00 US$
Top