DRV8806EVM

Mfr. #: DRV8806EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DRV8806
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV8806EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8806EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 4 Channel Low-Side Driver IC package type: DRV8806 Output voltage: 40 V This tool is designed for the DRV8806. Input Voltage Range: 8.2 V to 40 V Output current: 2 A

DRV8806EVM Image

DRV8806EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8806EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 4 Channel Low-Side Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8806
  • Output-Voltage 40 V
  • Tool-Is-For-Evaluation-Of DRV8806
  • Input-Voltage 8.2 V to 40 V
  • Output-Current 2 A

DRV8806EVM

DRV8806EVM Specifications

DRV8806EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 4 Channel Low-Side Driver.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8806

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 40 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8806.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 8.2 V to 40 V

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 2 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
114,63 US$
114,63 US$
10
108,90 US$
1 088,98 US$
100
103,17 US$
10 316,70 US$
500
97,44 US$
48 717,75 US$
1000
91,70 US$
91 704,00 US$
Top