DRV8802EVM

Mfr. #: DRV8802EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DRV8802
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV8802EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8802EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V IC package type: DRV8802 This tool is designed for the DRV8802. USB interface type

DRV8802EVM Image

DRV8802EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8802EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8802
  • Tool-Is-For-Evaluation-Of DRV8802
  • Interface-Type USB

DRV8802EVM

DRV8802EVM Specifications

DRV8802EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8802

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8802.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
172,52 US$
172,52 US$
10
163,89 US$
1 638,89 US$
100
155,26 US$
15 526,35 US$
500
146,64 US$
73 318,90 US$
1000
138,01 US$
138 012,00 US$
Top