DRV8313EVM

Mfr. #: DRV8313EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE DRV8313
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV8313EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8313EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8313 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3 Half Bridge Drivers IC package type: DRV8313 This tool is designed for the DRV8313. USB interface type Input Voltage Range: 8 V to 48 V

DRV8313EVM Image

DRV8313EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8313EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8313
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3 Half Bridge Drivers
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8313
  • Tool-Is-For-Evaluation-Of DRV8313
  • Interface-Type USB
  • Input-Voltage 8 V to 48 V

DRV8313EVM

DRV8313EVM Specifications

DRV8313EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8313.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 3 Half Bridge Drivers

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8313

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8313.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 8 V to 48 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
114,63 US$
114,63 US$
10
108,90 US$
1 088,98 US$
100
103,17 US$
10 316,70 US$
500
97,44 US$
48 717,75 US$
1000
91,70 US$
91 704,00 US$
Top