| Mfr. #: | DRV602EVM2 |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MODULE FOR DRV602 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | DRV602EVM2 Ficha de datos |


Product belongs to the DirectPath series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 5.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV602 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV602.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV602EVM2 Specifications
A: What is the Series of the product?
Q: The Series of the product is DirectPath.
A: At what frequency does the Type?
Q: The product Type is Audio Amplifiers.
A: Is the cutoff frequency of the product Output-Type?
Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 3 V ~ 5.5 V.
A: At what frequency does the Max-Output-Power-x-Channels-Load?
Q: The product Max-Output-Power-x-Channels-Load is -.
A: Is the cutoff frequency of the product Amplifier-Type?
Q: Yes, the product's Amplifier-Type is indeed Class AB
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV602.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 3.3 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV602