DRV3204EVM

Mfr. #: DRV3204EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DRV3204
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV3204EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3204EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers This product is designed DRV3204-Q1 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3-Ph Brushless DC (BLDC) Motors IC package type: DRV3204 This product is an An application board to evaluate the DRV3204-Q1. This tool is designed for the DRV3204-Q1. SPI interface type Input Voltage Range: 12 V Output current: 10 A

DRV3204EVM Image

DRV3204EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3204EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • For-Use-With DRV3204-Q1
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3-Ph Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV3204
  • Description-Function An application board to evaluate the DRV3204-Q1
  • Tool-Is-For-Evaluation-Of DRV3204-Q1
  • Interface-Type SPI
  • Input-Voltage 12 V
  • Output-Current 10 A

DRV3204EVM

DRV3204EVM Specifications

DRV3204EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DRV3204-Q1.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3-Ph Brushless DC (BLDC) Motors.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV3204.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is An application board to evaluate the DRV3204-Q1.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV3204-Q1.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 12 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 10 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
1,00 US$
1,00 US$
10
957,47 US$
9 574,72 US$
100
907,08 US$
90 707,85 US$
500
856,69 US$
428 342,65 US$
1000
806,29 US$
806 292,00 US$
Top