DRV3201EVM

Mfr. #: DRV3201EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DRV3201
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV3201EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3201EVM Overview

Product belongs to the DRV3201 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV3201 Output voltage: 3.3 V 5 V This product is an Evaluates the operation and performance of the DRV3201-Q1 bridge driver. This tool is designed for the DRV3201-Q1. CAN JTAG LIN SPI USB interface type Input Voltage Range: 4.75 V to 30 V Output current: 400 mA 2.5 A

DRV3201EVM Image

DRV3201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV3201
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV3201
  • Output-Voltage 3.3 V 5 V
  • Description-Function Evaluates the operation and performance of the DRV3201-Q1 bridge driver
  • Tool-Is-For-Evaluation-Of DRV3201-Q1
  • Interface-Type CAN JTAG LIN SPI USB
  • Input-Voltage 4.75 V to 30 V
  • Output-Current 400 mA 2.5 A

DRV3201EVM

DRV3201EVM Specifications

DRV3201EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV3201.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV3201

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V 5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluates the operation and performance of the DRV3201-Q1 bridge driver.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV3201-Q1.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is CAN JTAG LIN SPI USB.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 4.75 V to 30 V

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 400 mA 2.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
774,93 US$
774,93 US$
10
736,18 US$
7 361,84 US$
100
697,44 US$
69 743,70 US$
500
658,69 US$
329 345,25 US$
1000
619,94 US$
619 944,00 US$
Top