| Mfr. #: | DRV110EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MODULE FOR DRV110 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | DRV110EVM Ficha de datos |


Product belongs to the DRV110 series. This product is categorized as Evaluation Modules Type: Current Mode PWM Controllers Bulk is the packaging method for this product This product is designed DRV110 DRV120 amplifier. The Power Management, Solenoid Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV110 Maximum operating temperature of + 35 C Minimum operating temperature: - 40 C This product is an DRV110A 14-pin TSSOP. This tool is designed for the DRV110 DRV120. Input Voltage Range: 7 V to 48 V 100 V to 240 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DRV110.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Current Mode PWM Controllers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: Is the cutoff frequency of the product For-Use-With?
Q: Yes, the product's For-Use-With is indeed DRV110 DRV120
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Solenoid Control
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV110
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 35 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed DRV110A 14-pin TSSOP
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV110 DRV120.
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 7 V to 48 V 100 V to 240 V.