DOLPHIN-HP-EVM

Mfr. #: DOLPHIN-HP-EVM
Fabricante: Texas Instruments
Descripción: KIT EVAL DOLPHIN HI-POWER
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DOLPHIN-HP-EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DOLPHIN-HP-EVM Overview

Compatible with TRF6903, DBB03A. Product belongs to the - series. Type: Transmitter This product's 902MHz ~ 928MHz range is 0Hz to 2.2GHz. Included item: 4 Boards, Cable, Software.

DOLPHIN-HP-EVM Image

DOLPHIN-HP-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DOLPHIN-HP-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF6903, DBB03A
  • Series -
  • Type Transmitter
  • Frequency 902MHz ~ 928MHz
  • Supplied-Contents 4 Boards, Cable, Software

DOLPHIN-HP-EVM

DOLPHIN-HP-EVM Specifications

DOLPHIN-HP-EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF6903, DBB03A.

  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Type?

    Q: The product Type is Transmitter.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 902MHz ~ 928MHz.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 4 Boards, Cable, Software

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
0,00 US$
0,00 US$
10
0,00 US$
0,00 US$
100
0,00 US$
0,00 US$
500
0,00 US$
0,00 US$
1000
0,00 US$
0,00 US$
Top