DAC8750EVM

Mfr. #: DAC8750EVM
Fabricante: Texas Instruments
Descripción: EVAL BOARD 16BIT DAC DAC8750
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC8750EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8750EVM Overview

Product belongs to the DAC8750 series. This product is categorized as Evaluation Kits Type: DAC Bulk is the packaging method for this product This product is designed DAC8750 amplifier. This product operates at a 3.3 V supply voltage for reliable performance. This product is an A complete evaluation kit that includes a USB-based motherboard called the SM-USB-DIG USB cable. This tool is designed for the DAC8750. HART I2C SPI USB interface type

DAC8750EVM Image

DAC8750EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8750EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC8750
  • Product Evaluation Kits
  • Type DAC
  • Packaging Bulk
  • For-Use-With DAC8750
  • Operating-Supply-Voltage 3.3 V
  • Description-Function A complete evaluation kit that includes a USB-based motherboard called the SM-USB-DIG USB cable
  • Tool-Is-For-Evaluation-Of DAC8750
  • Interface-Type HART I2C SPI USB

DAC8750EVM

DAC8750EVM Specifications

DAC8750EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DAC8750

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DAC8750.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed A complete evaluation kit that includes a USB-based motherboard called the SM-USB-DIG USB cable

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8750

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed HART I2C SPI USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
0,00 US$
0,00 US$
10
0,00 US$
0,00 US$
100
0,00 US$
0,00 US$
500
0,00 US$
0,00 US$
1000
0,00 US$
0,00 US$
Top