DAC8554EVM

Mfr. #: DAC8554EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE FOR DAC8554
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC8554EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8554EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8554. SPI interface type

DAC8554EVM Image

DAC8554EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8554EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8554
  • Interface-Type SPI

DAC8554EVM

DAC8554EVM Specifications

DAC8554EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8554

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
73,50 US$
73,50 US$
10
69,82 US$
698,25 US$
100
66,15 US$
6 615,00 US$
500
62,48 US$
31 237,50 US$
1000
58,80 US$
58 800,00 US$
Top