DAC8168EVM

Mfr. #: DAC8168EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DAC8168
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC8168EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8168EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC8168. SPI interface type

DAC8168EVM Image

DAC8168EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8168EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC8168
  • Interface-Type SPI

DAC8168EVM

DAC8168EVM Specifications

DAC8168EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8168

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
9,42 US$
9,42 US$
10
8,95 US$
89,49 US$
100
8,48 US$
847,80 US$
500
8,01 US$
4 003,50 US$
1000
7,54 US$
7 536,00 US$
Top