DAC7741EVM

Mfr. #: DAC7741EVM
Fabricante: Texas Instruments
Descripción: EVAL MOD FOR DAC7741
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC7741EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC7741EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 10 V to 15 V supply voltage for reliable performance. This tool is designed for the DAC7741.

DAC7741EVM Image

DAC7741EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC7741EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 10 V to 15 V
  • Tool-Is-For-Evaluation-Of DAC7741

DAC7741EVM

DAC7741EVM Specifications

DAC7741EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 10 V to 15 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC7741.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
154,20 US$
154,20 US$
10
146,49 US$
1 464,90 US$
100
138,78 US$
13 878,00 US$
500
131,07 US$
65 535,00 US$
1000
123,36 US$
123 360,00 US$
Top