DAC5674EVM

Mfr. #: DAC5674EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DAC5674
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC5674EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5674EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5674.

DAC5674EVM Image

DAC5674EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5674EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5674

DAC5674EVM

DAC5674EVM Specifications

DAC5674EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5674.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
28,64 US$
28,64 US$
10
27,20 US$
272,03 US$
100
25,77 US$
2 577,15 US$
500
24,34 US$
12 169,90 US$
1000
22,91 US$
22 908,00 US$
Top