DAC3282EVM

Mfr. #: DAC3282EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR DAC3282
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC3282EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3282EVM Overview

This product is categorized as Evaluation Modules Type: DAC This product operates at a 6 V supply voltage for reliable performance. This tool is designed for the DAC3282. USB interface type

DAC3282EVM Image

DAC3282EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3282EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Modules
  • Type DAC
  • Operating-Supply-Voltage 6 V
  • Tool-Is-For-Evaluation-Of DAC3282
  • Interface-Type USB

DAC3282EVM

DAC3282EVM Specifications

DAC3282EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 6 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC3282.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
0,00 US$
0,00 US$
10
0,00 US$
0,00 US$
100
0,00 US$
0,00 US$
500
0,00 US$
0,00 US$
1000
0,00 US$
0,00 US$
Top