| Mfr. #: | CDCLVP2104EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | EVAL MODULE FOR CDCLVP2104 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | CDCLVP2104EVM Ficha de datos |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 4 Inputs, 8 Outputs IC package type: CDCLVP2104 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP2104.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP2104EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: At what frequency does the Type?
Q: The product Type is Clock Buffers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Frequency of the product?
Q: The Frequency of the product is 200 MHz 2 GHz.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Timing, Clock Buffer / Driver / Receiver / Translator.
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is 4 Inputs, 8 Outputs.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is CDCLVP2104.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 2.375 V to 3.6 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is CDCLVP2104.