CDCLVC1104EVM

Mfr. #: CDCLVC1104EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR CDCLVC1104
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCLVC1104EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVC1104EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Buffers This product's 180 MHz 250 MHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVC1104 This product operates at a 2.5 V 3.3 V supply voltage for reliable performance. This tool is designed for the CDCLVC1104. SMA interface type

CDCLVC1104EVM Image

CDCLVC1104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVC1104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Buffers
  • Frequency 180 MHz 250 MHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVC1104
  • Operating-Supply-Voltage 2.5 V 3.3 V
  • Tool-Is-For-Evaluation-Of CDCLVC1104
  • Interface-Type SMA

CDCLVC1104EVM

CDCLVC1104EVM Specifications

CDCLVC1104EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 180 MHz 250 MHz.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Clock Buffer

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVC1104.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.5 V 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCLVC1104

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
223,50 US$
223,50 US$
10
212,32 US$
2 123,25 US$
100
201,15 US$
20 115,00 US$
500
189,98 US$
94 987,50 US$
1000
178,80 US$
178 800,00 US$
Top