CDCE62005EVM

Mfr. #: CDCE62005EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR CDCE62005
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCE62005EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE62005EVM Overview

Product belongs to the CDCE62005 series. This product is categorized as Evaluation Modules Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 1.5 GHz range is 0Hz to 2.2GHz. The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE62005 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCE62005. USB interface type

CDCE62005EVM Image

CDCE62005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE62005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series CDCE62005
  • Product Evaluation Modules
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 1.5 GHz
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE62005
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCE62005
  • Interface-Type USB

CDCE62005EVM

CDCE62005EVM Specifications

CDCE62005EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is CDCE62005.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Frequency Synthesizers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 1.5 GHz

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Frequency Synthesizer

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 3 Inputs, 10 Outputs.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDCE62005

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCE62005.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
298,50 US$
298,50 US$
10
283,58 US$
2 835,75 US$
100
268,65 US$
26 865,00 US$
500
253,72 US$
126 862,50 US$
1000
238,80 US$
238 800,00 US$
Top