CDCE62002EVM

Mfr. #: CDCE62002EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR CDCE62002
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCE62002EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE62002EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 4.25 MHz to 1.175 GHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCE62002 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCE62002. USB interface type

CDCE62002EVM Image

CDCE62002EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE62002EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 4.25 MHz to 1.175 GHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDCE62002
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCE62002
  • Interface-Type USB

CDCE62002EVM

CDCE62002EVM Specifications

CDCE62002EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Frequency Synthesizers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 4.25 MHz to 1.175 GHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Generator.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCE62002.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCE62002

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
230,43 US$
230,43 US$
10
218,91 US$
2 189,08 US$
100
207,39 US$
20 738,70 US$
500
195,87 US$
97 932,75 US$
1000
184,34 US$
184 344,00 US$
Top