CDCE18005EVM

Mfr. #: CDCE18005EVM
Fabricante: Texas Instruments
Descripción: EVALUATION MODULE FOR CDCE18005
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCE18005EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE18005EVM Overview

Product belongs to the - series. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE18005 This tool is designed for the CDCE18005.

CDCE18005EVM Image

CDCE18005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE18005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE18005
  • Tool-Is-For-Evaluation-Of CDCE18005

CDCE18005EVM

CDCE18005EVM Specifications

CDCE18005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 3 Inputs, 10 Outputs

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCE18005.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCE18005.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
230,43 US$
230,43 US$
10
218,91 US$
2 189,08 US$
100
207,39 US$
20 738,70 US$
500
195,87 US$
97 932,75 US$
1000
184,34 US$
184 344,00 US$
Top