CDC3S04EVM

Mfr. #: CDC3S04EVM
Fabricante: Texas Instruments
Descripción: EVAL MODULE FOR CDC3S04
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDC3S04EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC3S04EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 52 MHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDC3S04 Minimum operating temperature: - 30 C This product operates at a 2.2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDC3S04. I2C interface type

CDC3S04EVM Image

CDC3S04EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC3S04EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 52 MHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDC3S04
  • Minimum-Operating-Temperature - 30 C
  • Operating-Supply-Voltage 2.2 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDC3S04
  • Interface-Type I2C

CDC3S04EVM

CDC3S04EVM Specifications

CDC3S04EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Buffers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 52 MHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDC3S04.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 30 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.2 V to 3.6 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDC3S04.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
172,52 US$
172,52 US$
10
163,89 US$
1 638,89 US$
100
155,26 US$
15 526,35 US$
500
146,64 US$
73 318,90 US$
1000
138,01 US$
138 012,00 US$
Top